Tracker Meeting, 10 September 2012
Agenda: minutes
- Actions:
- CMacW: Valve on cryostat needs replacing after accident.
- ML, ES, OL, AD, KL: Urgent to add description of the geometry and complete the coordinate system description to the tracker s/w write up. CH and AD to join geometry meeting.
- EO to talk with PS about securing a pulsar.
- Prepare for tracker refurbishment in Lab7.
- Particle trigger relationship to ISIS clock: EO
- Single Station test - status of analysis: ES DA, CH
- Preparations for full tracker system
- Mechanical/Installation: GB
- Services in the MICE hall: CMacW
- Mitigation of effect of magnetic field: CMacW
- Software status
- Schedule review: KL
- AoB and summary of actions.