Tracker Meeting, 16 July 2012



Agenda: minutes
  1. Actions:
    • CMacW: Valve on cryostat needs replacing after accident.
    • ML, ES, OL, AD, KL: Urgent to add description of the geometry and complete the coordinate system description to the tracker s/w write up.
    • KL: Prepare for review of schedules.
    • CMacW, PR: list all items that may be affected adversely by the magnetic field.
  2. Particle trigger relationship to ISIS clock: EO
  3. Single Station test - status of analysis: ES DA
  4. Preparations for full tracker system
  5. Mechanical/Installation: GB
    • LED: EO
    • Cryo and electrical: CMacW
    • DAQ/Calibration: DA
  6. Services in the MICE hall: CMacW
  7. Mitigation of effect of magnetic field: CMacW
  8. Software status
    • Overview and pattern recognition: AD
    • Track fit: ES
    • Simulation: PK, CH
    • Documentation: KL
  9. Schedule review: KL
  10. Next meeting
    • Next Tracker workshop:
      • September? October?
    • Agenda for collaboration meeting parallel.
  11. AoB and summary of actions.

Speakers can upload talks here

Date: Monday, 16th July 2012
Time: 16:00 BST

Connection details:
The four digit company id: 4673 (callers from outside the UK); and
The pin number: 419357
Dial-in numbers are available here.

Edward Santos - 16th July 2012