Tracker Meeting, 9 January 2012



Agenda: minutes
  1. Actions:
    • CMacW: List of things to check if Auto Dialler calls.
    • EO: Consider digitizing ISIS clock during December run.
    • CMacW: Valve on cryostat needs replacing after accident.
  2. Cosmic test and h/w status in Lab7:
    • Hardware status: EO,CMacW
    • Progress of cosmic run: ES
  3. Preparations for single station test in the MICE Hall:
    • Mechanical: GB
    • Electronics, cryo and electrical: CMacW
  4. Preparation for installation in the MICE Hall:
    • Mechanical: GB
      • He window.
      • LED system.
      • Lead energy filter swap.
      • Hall probe fixtures.
    • Electronics, cryo and electrical: CMacW
  5. R/o status: DA,EO,PR
  6. Slow control status: MR
  7. Software status: AD, DA, ES, OL
  8. Snagging list:
    • Zero suppression, implies calibration etc.;
    • Automation of data transfer in Lab7;
    • Sort out events with empty data from one or other tracker;
    • MC responsible person becomes Paul Kybert; need list of jobs;
    • Handling of ISIS RF in MICE Hall;
    • Implementation of integration window, clock etc. in the MICE Hall;
    • Distribution/scheme for handling detector "busy" signals in the MICE Hall;
    • Add check sum or other data integrity token to r/o.
    • Schedule review [review of "aims" for the moment]
    • Next meeting:
      • Next Tracker workshops:
        • CM32: 13Feb12
        • 12-13Apr12
  9. AoB and summary of actions.

Speakers can upload talks here

Date: Monday, 9th January 2012
Time: 16:30 GMT

Connection details:
The four digit company id: 4673 (callers from outside the UK); and
The pin number: 419357
Dial-in numbers are available here.

Edward Santos - 5th December 2011