Tracker Meeting, 10 October 2011



Agenda: minutes
  1. Actions:
    • CMacW: List of things to check if Auto Dialler calls.
    • EO: Consider digitizing ISIS clock during December run.
    • KL: Implement barriers appropriately in Lab7.
    • CMacW: Valve on cryostat needs replacing after accidenti
    • MR: MKS1937 not reading out
    • MR: MICE subnet not providing outbound routing, talk to David Colling and Linda Coney
    • KL: Set up networking meeting if required
  2. Cosmic test and h/w status in Lab7:
    • Hardware status: EO,CMacW
    • Progress of cosmic run: ES
  3. Mechanical update: GB
    • He window.
    • LED system.
    • Hall probe fixtures.
      • In abeyance.
  4. R/o status: DA,EO,PR
  5. Slow control status: MR
  6. Software status: ES
  7. Next meeting:
    • Phone call Monday 17Oct11; 15:00 BST -- should we consider time? (in conflict with IDS-NF)
    • Tracker w/s: 15/16 December 2011 at RAL.
  8. Points for the next tracker workshop:
    • Items to be collected here until we make the agenda for the w/s
      • Specification of slow control system for the tracker;
      • Tracker s/w;
      • Where do we want to run the tracker; i.e. both in beam and out;
      • Installation and maintenance.
  9. AoB and summary of actions.

Speakers can upload talks here

Date: Monday, 10th October 2011
Time: 15:00 BST (i.e. 14:00 GMT)

Connection details:
The four digit company id: 4673 (callers from outside the UK); and
The pin number: 419357
Dial-in numbers are available here.

Edward Santos - 10th October 2011