Tracker Meeting, 4 Apr 2011
Agenda: minutes
- Actions:
- CMacW,KL: Chase chiller servicing in Lab7.
- MA: Make plan and liaise with KL and ABr to make proposed schedule for discussion at the next tracker meeting.
- ABr/PR will mark up a photo with the position that the set-point voltage should be measured at.
- KL: Put He window and installation widgets (i.e. mechanical item for GB) back on agenda.
- Mechanical update: GB
- H/w status in Lab 7: CMacW et al.
- R/o status: DA
- Software status: MA,ES,CH
- AoB and summary of actions.
- ABr and PR will arrive: 15Apr11 -- 21Apr11