Tracker Meeting, 4 Apr 2011



Agenda: minutes
  1. Actions:
    • CMacW,KL: Chase chiller servicing in Lab7.
    • MA: Make plan and liaise with KL and ABr to make proposed schedule for discussion at the next tracker meeting.
    • ABr/PR will mark up a photo with the position that the set-point voltage should be measured at.
    • KL: Put He window and installation widgets (i.e. mechanical item for GB) back on agenda.
  2. Mechanical update: GB
  3. H/w status in Lab 7: CMacW et al.
  4. R/o status: DA
  5. Software status: MA,ES,CH
  6. AoB and summary of actions.
    • ABr and PR will arrive: 15Apr11 -- 21Apr11

Speakers can upload talks here

Date: Monday, 4th April 2011
Time: 17:30 BST (i.e. 16:30 GMT)

Connection details:
The four digit company id: 4673 (callers from outside the UK); and
The pin number: 419357
Dial-in numbers are available here.

Edward Santos - 4th April 2011