Tracker Meeting, 3 Feb 2009
Agenda: minutes
- Status of MICE Note on cosmic test of tracker #1 LC
- Diffuser integration tets: status/plans GB
- Cosmic test of trackers #1 and #2 in Lab7 GB
- Need to put weather strip along outside door of Lab7?
- Machanical: GB
- Use of go-no-go gauge at Wang NMR;
- CMM data report
- Hall probes and liaison with F.Filhaut
- DAQ/Slow control
- Spectrometer solenoid update ABr
- NIM paper: KL
- TRD update:
- Updates Lead authors
- Cost/schedule to complete tracker module review:
- Updates KL
- DONM:
- 17Feb09: 14:30 GMT
- AoB: