Tracker Meeting, 2 Sep 2008


Agenda: minutes
  1. Status of cosmic test of tracker #1: ME
  2. Cosmic test of tracker #2?: All
  3. Mechanical:
    • Status of build of tracker #2: GB
  4. Status of final station QA: JL
  5. DAQ/Slow control:
    • Status of Cryo #3/#4: AB
    • Status of r/o of firmware etc.: TH
  6. NIM paper:
    • WWW page for comunication and outline: ME
    • Progress: All
  7. Cost/schedule to complete tracker module review:
    • Items not yet complete:
      • Mechanical/installation (gases and mechanical services): GB
      • Field monitoring: FF
      • Cryo/readout and electrical services: ABr
      • Readout/slow control/software: ME
  8. DONM:
    • 09Sep08: 13:30 GMT
  9. AoB:

Speakers can upload talks here
See below for connection details.

Date: Tuesday, 2nd September 2008
Time: 13:30 GMT

Phone details
* Please enter the pin number: 124156

UK                0870 22 333 33
US                1 641 715 3715
Austria*          083 4000 1503
Belgium           070 35 9945
Spain*            902 885318
France            0826 100 213 (calls answered in French)
                  0826 100 211 (calls answered in English)
Germany           01805 00 66 85 (calls answered in German)
                  01805 00 66 83 (calls answered in English)
Ireland           0818 270 007
Switzerland       0848 560 190
Holland           0870 001 909 (calls answered in Dutch)
                  0870 001 901 (calls answered in English)
Italy             848 390 166
SkypeOut          +99 03 769 4422
Other countries   +44 870 22 333 33

Hideyuki Sakamoto - 2nd September 2008