MICE Installation Meeting

January 24, 2008

-


Agenda:

  1. Status of ISIS and schedule of MICE time (Chris Rogers)
  2. Status and planning of the beamline (Andy Nichols)
  3. Beam line monitors (Paul Kyberd)
  4. TOF0 (Maurizio Bonesini)
  5. Tracker status and plans (Alan Bross / Ken Long)
  6. Other scintillators (Paul Soler, Jean-Sebastien Graulich)
  7. Controls and monitoring (Peter Owens)
  8. Radiation surveys
  9. Conclusion: proposal for operations in ISIS period I
  10. AoB

Speakers can upload talks here.

See below for connection details.


Date: Thursday, January 24, 2008
Time: 14:30-16:30 GMT
Dial-in Number: 1-510 665 5437
Participant code: 6426 (MICO)


Yağmur Torun January 23, 2008