Tracker Phone Conference, 22 June 2007

 * Upstream tracker:

    - Waveguides for stations 1 and 5 built and length OK

    - Waveguides for stations 2, 3, and 4 will be produced by the end
      of June

    - Error in cutting fibres at G-Tech:

    - Internal w/g length is OK (longer than that specified
      in Takashi's note)

    - External w/g length is OK, according to a review of the lengths
      by Geoff

    - Today (i.e. Tuesday) Ash is checking the length of the w/gs on the
      model to confirm that the length is OK.

    - Makoto will produce drawings of each harness and circulate.

 * Downstream tracker:

    - Two options: use lengths as specified by Takashi, use those defined by
      G-Tech when cutting the w/gs for the upstream tracker.

    - Preference for second option to have common set of parts.  To be 
      reviewed.

  * We agreed to have a phone call on Friday to review work on model,
    drawings from Makoto, and to discuss the way forward.

Agenda: minutes
  1. AoB-i: All
  2. AoB-ii: All
  3. AoB-iii: All
  4. AoB-iv: All
  5. AoB-v: All

Speakers can upload talks here
See below for connection details.

Date: Friday, 22 June 2007
Time: 14:00 GMT

Phone details
* Please enter the pin number: 124156

UK                0870 22 333 33
US                1 641 9 85 86 85
Austria*          0820 4000 1503
Belgium           070 35 9945
Spain*            902 885318
France            0826 100 213 (calls answered in French)
                  0826 100 211 (calls answered in English)
Germany           01805 00 66 85 (calls answered in German)
                  01805 00 66 83 (calls answered in English)
Ireland           0818 270 007
Switzerland       0848 560 190
Holland           0870 001 909 (calls answered in Dutch)
                  0870 001 901 (calls answered in English)
Italy             848 390 166
SkypeOut          +99 03 769 4422
Other countries   +44 870 22 333 33

Takashi Matsushita - 21 June 2007

last edited Thu Jun 21 12:18:38 2007 by takashi