Phone Conference
MICE Analysis
September 7, 2006
Last meeting
Preliminary agenda:
Downstream detector sizes and scraping
Constraints, requirements and impact on schedule - Vittorio
Summary of downstream scraping results
- Rikard
Impact on acceptance measurement - Chris
Summary of transmission results
- Marco
Thoughts on the solution - Alain
Tasks and schedule
- Yagmur
Analysis sessions at cm16
- Yagmur
Updates
- All
Data challenge
- Malcolm
TOF resolution document - Chris
SFoFo channel dynamics - Chris
Stage III - Marco
Run Plan - Yagmur
TOF measurements and relation to trigger
Rf voltage calibration
Collimation, scraping upstream - Kenny/Tom
Rf-induced background in TOF - Yagmur/Rikard
Global PID performance - Rikard
Window shape, absorber density effects
Weighting, virtual beam - Chris
Performance indicators - Chris
6D cooling - Amit/Chris
AoB
Speakers can upload talks
here
.
See below for connection details.
Date: Thursday, September 7, 2006
Time:
16:00 GMT
Dial-in Number: 1-510 665 5437
Participant code: 6423262 (MICE ANA)
Yagmur Torun
September 6, 2006