Phone Conference

PID Detectors

August 31, 2006

  1. Production of test beam n-tuples (Pietro)
  2. Update on analysis of TOF data (Maurizio / Jordan)
  3. Update on analysis of EMCal data (Andrea / Domizia)
  4. First simulations of test beam settings (Pietro)
  5. CKOVI: short update, preparation of review (Lucien)
  6. Upstream PID simulation: progress with G4BEAM (Kenny)
  7. Upstream PID simulation: progress with G4MICE (Hideyuki)
  8. Downstream scraping, radii of shields & detectors (Yagmur/ Rikard)
  9. PID at next MICE VC and CM16 (Vittorio)
  10. AoB

Speakers can upload talks here.

See below for connection details.


Date: Thursday, August 31, 2006
Time: 15:00-17:00 GMT
Dial-in Number: 1-510 665 5437
Participant code: 6423743 (MICE PID)


Yagmur Torun August 27, 2006