19 December, 2014 (Henry Nebrensky) - Diffuser and various around MICE Hall
Diffuser in action - 4 Diffuser - 1 Diffuser - 3 Diffuser - 2 Diffuser in action - 5
Tracker cryostat and TOF1 LH2 System pipework on mound - 1 LH2 System pipework on mound - 2 New power strip in Server Rack Rack Room Aircon unit turned
Decay Solenoid powered
8 December, 2014 (Henry Nebrensky) - Various around MICE Hall
Demin water connections Crash-out Assembly Decay Solenoid PSU test Decay Solenoid Power Q9 water leak repair
SS2 detail - 1 AFC2 detail SS2 detail - 2 Webcam/D2 clearance
Partial Return-Yoke supports Under the LH2 Mezzanine - 2 Fungi - 1 Fungi - 2 Fungi - 3
Malcolm Ellis' Visit - 1 Malcolm Ellis' Visit - 2
MICE Hall, SS, tracker readout (Credit: Stephen Kill)
Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1
Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1
Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1
AFC move (credit: Stephen Kill)
Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1
Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1
Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1
Partial Return-Yoke supports - 1 Partial Return-Yoke supports - 1
12 November, 2014 (Henry Nebrensky) - PPS Equipment
Light Curtain Indicator Lamps - inactive Light Curtain Indicator Lamps - active Light Curtain Control Panel off Light Curtain Control Panel on - 1 Light Curtain Control Panel on - 2
Light Curtain off - side B Light Curtain tripped - side B Light Curtains on West Wall Mezzanine Light Curtain OK - side B Light Curtain OK - side A
Light Curtain Control Panel - West Wall Metal Detector display Metal Detector
3 November, 2014 (Henry Nebrensky) - MICE Hall
Under the LH2 Mezzanine - 1 Lonely Tracker cryostat Upstream Spectrometer Solenoid Cooling Channel
27 October, 2014 (Henry Nebrensky) - MICE Hall
Spectrometer Solenoid 2 - 1 Spectrometer Solenoid 1 - 2 Spectrometer Solenoid 1 - 1 Top of AFC1 AFC1 current connectors
Tracker cryocooler compressors - 2 Tracker cryocooler compressors - 1 Tracker cryostats Spectrometer Solenoid 2 pumpdown Spectrometer Solenoid 1 current connectors
Vacuum infrastructure Solenoid cryocooler water panel TOF 2 and KL EMR from above
MLCR refurb - 2 MLCR refurb - 1 Target phone CATx KVM system Floor hole drilling
24 October, 2014 (Henry Nebrensky) - MICE Hall
MLCR Foyer in use West mezz. cryocooler stands - 1 West mezz. cryocooler stands - 2 Cooling channel progress
21 October, 2014 - LH2 Absorber
Absorber Absorber Absorber Absorber Absorber
Absorber Absorber Absorber Absorber Absorber
Absorber Absorber
5 October, 2014 (Henry Nebrensky) - various
Brunel Server in new Datacentre Neutron Monitor serial connection DS Magnet-On Lamp on Water mains graveyard
22 September, 2014 (Henry Nebrensky) - Control Room Refurbishment
Foyer area painted MLCR painted Thin client assembly - 1 Thin client assembly - 2 Water mains graveyard
19 September, 2014 (Henry Nebrensky) - MICE Hall and cleared Control Room
Neutron Monitor - detector head Diffuser - detail Diffuser in place Empty Control Room Neutron Monitor - desiccant
18 September, 2014 (Henry Nebrensky) - Target Fibres - present routing
Target fibres existing route - 1 Target fibres existing route - 2 Target fibres existing route - 3 Target fibres existing route - 4 Target fibres existing route - 5
8 September, 2014 (Henry Nebrensky) - MICE Hall and (part-cleared) Control Room
South side walkway - 2 South side walkway - 1 Temporary Decay Solenoid controls Lifting gear and BOB MLCR foyer area
Old MLCR layout - 1 Old MLCR layout - 2 Old MLCR layout - 3 Old MLCR layout - 4 Old MLCR layout - 5
PPS Light Curtain Indicators PPS Light Curtains PPS Light Curtain Controls
8 August, 2014 - Tracker Installation Time-lapse Video
Download: mp4, webm, ogg
8 August, 2014 - Downstream Spectrometer Solenoid in Hall
Downstream SS Downstream SS Tracker Installation Tracker Installation
Downstream SS Downstream SS
30 July, 2014 (Henry Nebrensky) - SS1 in MICE Hall
SS1 in Cooling Channel - 1 SS1 in Cooling Channel - 2 SS1 installation time-lapse SS1 in Cooling Channel - 4
SS1 in Cooling Channel - 3
30 July, 2014 (Henry Nebrensky) - D1 Alignment
DS Magnet-On lamp
 
 
D1 upstream edge support
Upstream edge
support
D1 inner side supports
Inner side supports
(full size)
D1 downstream edge supports
Downstream edge
supports
29 July, 2014 (Henry Nebrensky) - R78 Chiller Trip
R78 chiller power - 1 R78 chiller power - 2 R78 chiller power - 3
July, 2014 (Henry Nebrensky) - various around MICE Hall
Trench roof reinforcement Old Decay Solenoid PSU Old Decay Solenoid PSU from above New Thin Client - 1 New Thin Client - 2
ISIS BLMs at 1 V ISIS BLMs at 2 V SS1 in MICE Hall - 1 SS1 in MICE Hall - 2 Linde Control PC Profibus connector
June 30, 2014 - Focus Coil
AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1
AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1
AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1
AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1
AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1
AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1
AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1
AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1 AFC1 in Hall - 1
AFC1 in Hall - 1 AFC1 in Hall - 1
June 25, 2014 (Henry Nebrensky) - various around MICE Hall
AFC1 in Hall - 1 AFC1 in Hall - 2 AFC1 on stand Cooling Channel June 2014 Cooling Channel with AFC1
June 18, 2014 (Henry Nebrensky) - various around MICE Hall
Old camera memory card is worn out! New corridor floor Replacement walkie-talkies Repaired POMPOM PSU New Decay Solenoid PSU installation
New Decay Solenoid PSU in place MICE Cooling Channel Equipment Door - inside bolt Equipment Door failure -1 Equipment Door failure -2
June 10, 2014 (Henry Nebrensky) - R9
AFC 1 and mapping gear - 1 AFC 1 and mapping gear - 2 AFC 1 and mapping gear - 3
May 15, 2014 (Henry Nebrensky) - various around MICE Hall
Rack Room 2 floor New PSU for Decay Solenoid - 1 New PSU for Decay Solenoid - 2 SS2 in MICE Hall Decay Solenoid cooldown starts
Equipment Door PPS damage POMPOM System damage - 1 POMPOM System damage - 2 POMPOM System damage - 3 POMPOM System damage - 4
May 9, 2014 - SS2 installation time-lapse footage
Download(mp4)
May 9, 2014 (Ken Long) - SS2 in MICE Hall
SS2 in MICE Hall SS2 in MICE Hall SS2 in MICE Hall SS2 in MICE Hall SS2 in MICE Hall
May 9, 2014 (Henry Nebrensky) - SS2 installation time-lapse footage
SS2 move time-lapse - short
Short
(or low quality version)
May 8, 2014 (Henry Nebrensky) - SS1 in R9
SS1 in R9
May 7, 2014 (Henry Nebrensky) - SS2 in MICE Hall, and other
Cerenkov purge air piping SS2 in Hall - 2 SS2 in Hall - 1 SS2 in Hall - 3 SS2 in Hall - 4
SS2 in Hall - 5 SS2 in Hall - 6 SS2 in Hall - 7
ISIS TS1 recladding - 1 SS2 in Hall - 8 ISIS TS1 recladding - 2
April 25 2014 - SS1 Leaving for RAL
SS1 on its way SS1 on its way SS1 on its way SS1 on its way SS1 on its way
SS1 on its way SS1 on its way SS1 on its way SS1 on its way SS1 on its way
SS1 on its way SS1 on its way SS1 on its way SS1 on its way SS1 on its way
SS1 on its way SS1 on its way SS1 on its way SS1 on its way SS1 on its way
SS1 on its way SS1 on its way SS1 on its way SS1 on its way SS1 on its way
SS1 on its way SS1 on its way
April 23, 2014 (Henry Nebrensky) - D1 Alignment
D1 Pitch - 1
Pitch
D1 Pitch - 2
Pitch (full size)
D1 Roll - 1
Roll
D1 Roll - 2
Roll (full size)
Upstream Beampipe D1 Trolley - 1 D1 Trolley - 2
April 22, 2014 (Henry Nebrensky) - Various in MICE Hall
Cooling Channel Rack Room 2 cable trays - 3 Rack Room 2 cable trays - 1 Rack Room 2 cable trays - 2 Pneumatic Proton Absorbers
Equipment Door - new upper bolt Equipment Door Bolt Extension Top of Spectrometer Solenoid model Top of D2 after cleaning
Tops of Q789 after cleaning
April 8, 2014 (Henry Nebrensky) - Equipment Door, Neutron Monitor
Equipment Door - broken bolt Equipment Door - mezzanine access - 1 Equipment Door - mezzanine access - 2 Neutron Monitor Repaired
March 14, 2014 (Yordan Karadzhov) - EMR Rack
EMR Rack - 1 EMR Rack - 2 EMR Rack - 5 EMR Rack - 3 EMR Rack - 4
March 13, 2014 (Ken Long) - Spectrometer Solenoid 2 in R9
SS R9 SS R9 SS R9 SS R9 SS R9
SS R9 SS R9 SS R9 SS R9 SS R9
SS R9 SS R9 SS R9 SS R9 SS R9
March 12, 2014 (Henry Nebrensky) - West Mezzanine, Rack Room 2, etc.
Hole in floor West Wall Mezzanine - 1 West Wall Mezzanine - 2 West Wall Mezzanine - 3 West Wall Mezzanine - 4
Rack-Room 2 Rack Layout - 1 Rack-Room 2 Rack Layout - 2 Rack-Room 2 Drain
Corridor Raised Floor - 2 MICE Van Parking Spot micestore errors Neutron Monitor Repaired Corridor Raised Floor - 1
February 19, 2014 (Henry Nebrensky) - MICE Hall various
One of Christo's lesser known efforts Dust in MPS air inlet Look - no right angles! MS/64 target operation Equipment door state
Temporary WENDI monitor - 1 Temporary WENDI monitor - 2
February 3, 2014 (Henry Nebrensky) - Decay Solenoid lead repair and various
Neutron Monitor Failure Target Rack UPS after outage New boot rack Third MICE bicycle PPS - SC Magnets Warning Beacon
DS unwrapped for soldering - 2 DS unwrapped for soldering - 1 DS unwrapped for soldering - 3
January 14, 2014 (Ed Overton) - MICE Target running at MS/64 in ISIS
Target in ISIS at full speed
January 14, 2014 (Henry Nebrensky) - MICE Hall and Decay Solenoid repair
Damaged UPS batteries DS work platform Q8 rainwater Q8 rainwater at drip tray Phones by target in ISIS
Damaged current lead DS unwrapped for welding - 2 DS unwrapped for welding - 1 DS unwrapped for welding - 3 Inside of DS endcap
.