MICE logo

MICE Photo Album - 2016

Cooling Channel graphic
-
Newer Photos Older Photos

December 2016 (Henry Nebrensky) - LH2 Absorber improvements
LH2 Absorber test set-up - 4 Turret MLI - 1 Magnet Face Turret MLI - 2 LH2 Absorber test set-up - 3
Cryocooler Vacuum Endcaps - 8
2 November 2016 (Henry Nebrensky) - Target Fibre inspection
Target fibres - Jn Box B single-mode Target fibres - Jn Box B multi-mode Target fibres - Jn Box B Target fibres - Jn Box C single-mode Target fibres - Jn Box C multi-mode
Optics block - 1 Optics block - 2
September/October 2016 (Henry Nebrensky) - Various around MICE Hall
Decay Solenoid Level Sensor - 2 Air-blast Chiller - 2 Air-blast Chiller - 1 Air-blast Chiller - 3 Decay Solenoid Level Sensor - 1
D2 Magnet-On Lamp Temporary neutron alarm (WENDI) - 3 Water Sensor at end of Trench Gutter Grid Crypto-token Hardware Token warning
September 2016 (Henry Nebrensky) - Water system in Trench
Trench Water System - 1 Trench Water System - 3 Heat Exchanger Trench Water System - 4 Trench Water System - 2
Mixing Valve - 1 Mixing Valve - 2 Mixing Valve - 3 Mixing Valve - range of movement Trench Water PLC
Trench Water Header Tank Trench Water Refill Tap Trench Circuit Pressure Gauge
September 2016 (Henry Nebrensky) - R78 and campus features
Cleaned VME Crate Cleaned Xantrex PSU Mushrooms - 1 Mushrooms - 2
September 2016 (Henry Nebrensky) - AFC2 preparation and Vacuum Endcaps
Vacuum Endcaps - 1 Vacuum Endcaps - 2 Vacuum Endcaps - 3 Vacuum Endcaps - 4 Vacuum Endcaps - 5
LH2 Absorber test set-up - 3 Vacuum Endcaps - 6 Vacuum Endcaps - 7 LH2 Absorber test set-up - 2
August 2016 (Henry Nebrensky) - Target Fibre inspection
Optics block ID Optics block before Target fibres - Jn Box C single-mode Target fibres - Jn Box C multi-mode Optics block after
August 2016 (Henry Nebrensky) - AFC2 and Vacuum Endcaps
Vacuum Endcap LH2 Absorber test set-up
July/August 2016 (Henry Nebrensky) - various around MICE Hall
Portable neutron alarm Temporary neutron alarm (WENDI) - 1 Temporary neutron alarm (WENDI) - 2 Target vac-rack area clean-up Air-conditioning unit 5
Air-conditioning unit 5 innards Secondary water manifold for cryo-compressors Abandoned OPI PC 2 Installed DCCTs for Cooling Channel magnets
1 July 2016 (Stephen Kill) - MICE Hall
MICE Hall MICE Hall MICE Hall MICE Hall MICE Hall
MICE Hall MICE Hall MICE Hall MICE Hall MICE Hall
MICE Hall MICE Hall MICE Hall MICE Hall MICE Hall
MICE Hall
20 July 2016 (Henry Nebrensky) - R78
R78 Target Run-In Rig - 1 Work area - 1 Work area - 2 Xantrex PSU R78 Target Run-In Rig - 2
VME Crate
June 2016 (Henry Nebrensky) - Q1 and Q2 power failure
Split washer inside connection Q1 water connection Poor excuse for PTFE tape Setting sun diffracted by TV
June 2016 (Henry Nebrensky) - various around MICE Hall
PRY draw-wire sensors - 1 PRY draw-wire sensors - 2 PRY draw-wire sensors - 3 Conventional magnet chilled water - 1 Back-up chiller - 2
SSU Dump resistor enclosure - 3 SSU Dump resistor enclosure - 1 SSU Dump resistor enclosure - 2 SSD Dump resistor enclosure Conventional magnet chilled water - 2
Ambient air temperature sensors - 1 Q5 water leak - 6 Q5 water leak - 7 Q5 water leak - 8 Ambient air temperature sensors - 2
Bee Orchid
May 2016 (Henry Nebrensky) - Target fibre inspection
Target fibres and optics block - 1 Target fibres and optics block - 2 Target fibres and optics block - 3 Jn box C location - 4 Jn box C location - 1
Jn box C location - 2 Target fibres - Jn Box C single-mode Target fibres - Jn Box C multi-mode Jn box C location - 3
May 2016 (Henry Nebrensky) - various around MICE Hall
Trench water detection Target fibres - Jn Box B single-mode AFC1 in Cooling Channel Target fibres - Jn Box B multi-mode Back-up chiller
April 2016 (Henry Nebrensky) - AFC2 Preparations in R9
AFC2 preparation - 1 AFC2 preparation - 2 AFC2 preparation - 3 AFC2 preparation - 4
April 2016 (Henry Nebrensky) - various around MICE Hall
New lock-out boxes DCCTs for Spectrometer Solenoids Beamstop frame warning signage AFC1 and cooling channel crawl space AFC1 back in channel
Boosted compressed air gauge Decay solenoid compressed air gauge Trench drain DS Control Unit cables - 1 DS Control Unit cables - 2
Back-up chiller - 1 Back-up chiller - 2
1 April 2016 (Henry Nebrensky) - Q5 Water Leak
Q5 Water Leak - 1 Q5 Water Leak - 2 Q5 Water Leak - 3 Q5 Water Leak - 4 Q5 Water Leak - 5
Focus Coil Mods - March 2016
Focus Coil Focus Coil Focus Coil Focus Coil Focus Coil
Focus Coil Focus Coil Focus Coil Focus Coil
9 March 2016 (Henry Nebrensky) - various in MICE Hall
LiH in AFC1 AFC1 load cell wiring Icing up of DS current lead Empty LiH Absorber barrel
9 March 2016 (John Govans) - Lithium Hydride Absorber installation into AFC1
LiH Absorber installation - 1 LiH Absorber installation - 2 LiH Absorber installation - 3 LiH Absorber installation - 4 LiH Absorber installation - 5
LiH Absorber installation -  6 LiH Absorber installation -  7 LiH Absorber installation -  8 LiH Absorber installation -  9 LiH Absorber installation - 10
LiH Absorber installation - 11 LiH Absorber installation - 12 LiH Absorber installation - 13 LiH Absorber installation - 14 LiH Absorber installation - 15
LiH Absorber installation - 16 LiH Absorber installation - 17
8 March 2016 (Henry Nebrensky) - AFC1 Mylar Windows
AFC1 Mylar Windows - 1 AFC1 Mylar Windows - 2 AFC1 Mylar Windows - 3 AFC1 Mylar Windows - 4
4 March 2016 - ISIS vacuum
MICE Target Area Leaking vacuum clamp
February 2016 (Henry Nebrensky) - various in MICE Hall
PRY components Visibility inside PRY - south side Decay Solenoid PSU returned to Hall Visibility inside PRY - north side Decay Solenoid PSU in place
Downstream Tracker sealing AFC1 offline - 3 Diffuser and SSU AFC1 moved online
February 2016 (Henry Nebrensky) - R9 Partitioning
Storage space partitioning - 1 Storage space partitioning - 2
January 2016 (Henry Nebrensky) - Target Fibre Inspection
Target Fibres - Junction Box A Target Fibres - Junction Box C - 1 Target Fibres - Junction Box C - 2 Target Fibres - Junction Box B and Vac-Rack
January 2016 (Henry Nebrensky) - AFC exchange
SSD inside PRY AFC2 moved offline - 1 AFC2 moved offline - 2 LH2 pressure window AFC2 moved offline - 3
SSD tracker patch panel AFC2 moved offline - 4 AFC2 en route to R9 AFC1 offline - 1 AFC1 offline - 2
January 2016 (Henry Nebrensky) - Linde Compressor Service
Linde compressor service - 1 Linde compressor service - 2 Linde compressor service - 3 Linde compressor service - 4
January 2016 (Henry Nebrensky) - various around MICE Hall
Boosted Compressed Air Sensor - 1 Boosted Compressed Air Sensor - 2 Under the LH2 mezzanine Q6 water leak D2 PSU out of place
AKCP extender box on LH2 mezzanine Racks in RR1 - 1 Racks in RR1 - 2 Printer lead storage Steerable webcam
Salted paths - 1 Header tank for ISIS Linac Salted paths - 2
.

Newer Photos Older Photos

Henry Nebrensky Valid XHTML 1.0 Transitional 19 January 2017