MICE logo

MICE Photo Album

Cooling Channel graphic
-
Newer Photos Older Photos

MICE Collaboration
Collaboration Meeting CM41 Collaboration Collaboration Collaboration Meeting CM45 - 2 Collaboration Meeting CM45
4 April 2018 (Henry Nebrensky) - Upstream Beampipe
Quads-to-dipole section removed Quads-to-dipole section Dipole entry flange - 1
Inside of dipole beam chest Dipole entry flange - 2 Inside of Q123 beam pipe
28 March 2018 (Henry Nebrensky) - MICE Hall
Compressed Air Booster decommissioned MICE Hall
7 March 2018 (Henry Nebrensky) - Tracker tear-down and Helium pressure window removal
Diffuser iris aperture Tracker Helium pressure windows removed - 1 Clear view to Beamstop Tracker Helium pressure windows removed - 2 Tracker Cryostat tear-down - 1
Tracker Cryostat tear-down - 2 LH2 Test cryostat Tracker Cryostat tear-down - 3 Both Focus Coils in Hall R1 office cleared
28 February 2018 (Paolo Franchini) - Upstream Beamline
Upstream Beamline - panorama Upstream Beamline - 10 Upstream Beamline - 9
Upstream Beamline - 8 Upstream Beamline - 7 Upstream Beamline - 6 Upstream Beamline - 5 Upstream Beamline - 4
Upstream Beamline - 3 Upstream Beamline - 2 Upstream Beamline - 1 Upstream Beamline - 0
28 February 2018 (Henry Nebrensky) - Maintenance Day access to DSA and synchrotron; Tracker removal
TOF0 and shielding - 4 Upstream Tracker removed TOF0 and shielding - 1 TOF0 and shielding - 2 TOF0 and shielding - 3
Tracker Cryostat removal Snow at RAL - 1 Snow at RAL - 2 Snow at RAL - 3 Q3-D1 Beampipe
22 February 2018 (Henry Nebrensky) - Preparation for survey of the Trackers, emptying of Didcot storage
Diffuser removed Decay Solenoid Lifting Frame MICE Hall - 4 Q9 removed MICE Hall - 5
MICE Hall - 6 MICE Hall - 7 MICE Hall - 8
13 February 2018 (Henry Nebrensky) - Preparation for survey of the Trackers: removal of EMR
Access to Diffuser Detector Cabling MICE Hall - 1 MICE Hall - 3 MICE Hall - 2
TOF 1
7 February 2018 (Henry Nebrensky) - Preparation for survey of the Trackers
Q8 move - 1 Q8 move - 2 Q8 move - 4 Q8 move - 3 Q8 move - 5
EMR de-cabling
30 January 2018 (Henry Nebrensky) - R78 Target
R78 Target state - 1 R78 Target state - 2 R78 Target state - 3
January 2018 (Henry Nebrensky) - Upstream Beamline and DAQ Crates
DAQ Crates - 2 DAQ Crates - 1 DAQ Crates - 3
ISIS beampipe extraction window - 3 Upstream quads roll angle - 1 Upstream quads roll angle - 2 Survey reference mark underneath D1
3 and 4 January 2018 (Henry Nebrensky) - Target Fibre Inspection
Target fibres - Jn Box B single-mode Target fibres - Jn Box B multi-mode Target fibres - Jn Box C Target fibres - Jn Box C single-mode Target fibres - Jn Box C single-mode
.

Newer Photos Older Photos

Henry Nebrensky Valid XHTML 1.0 Transitional 4 April 2018