MICE logo

MICE Photo Album

Cooling Channel graphic
-
Newer Photos Older Photos

MICE Collaboration
Collaboration Meeting CM41 Collaboration Collaboration Collaboration Meeting CM45 - 2 Collaboration Meeting CM45
Painting the MICE wall
Winning design Runner-up Presentation at Neutrino 2016 conference
August 2017 (Henry Nebrensky) - various around MICE
Air-con unit 3 snowball - 1 Air-con unit 3 snowball - 2 R78 Target Controller Fibre offcuts on beampipe
4 August 2017 (Henry Nebrensky) - D1 field measurement
Hall probe - 1 Hall probe - 2 Hall probe - 3
July 2017 (Henry Nebrensky) - ISIS Synch and Target inspection
ISIS beampipe extraction window - 1 ISIS beampipe extraction window - 2 Disassembled dipole (SP 7) - 1 Disassembled dipole (SP 7) - 2 Nimrod dipoles
20 July 2017 (Henry Nebrensky) - MICE Hall: LH2 condenser and Beamstop restraint frame
Beamstop restraint frame - bent bolt Beamstop restraint frame - mounting holes (left) Prototype LH2 condenser Beamstop restraint frame - mounting holes (right) Beamstop restraint frame - fresh bolts
July 2017 (Henry Nebrensky) - R78 Target
Test rig re-start - 1 Test rig re-start - 2 Test rig re-start - 3 Test rig re-start - 4
23 June 2017 (Henry Nebrensky) - ISIS Synch and Target Fibre inspection
Disassembled dipole (SP 7) View of Target area Historical artefact... POMPOM sensor 1
Target fibres - Jn Box C single-mode Target fibres - Jn Box C multi-mode Target fibres - Jn Box B single-mode Target fibres - Jn Box B multi-mode
June 2017 (Henry Nebrensky) - R9
LH2 production condenser modifications - 7 LH2 production condenser modifications - 8 LH2 production condenser modifications - 9
May 2017 (Henry Nebrensky) - Coldtrapping the Tracker Cryostats
Tracker Cryostat 2 Coldtrapping - 1 Tracker Cryostat 2 Coldtrapping - 2 Tracker Cryostat 2 Coldtrapping - 3
EMR Rack Correct Status
Tracker Cryostat 1 Coldtrapping - 1 Tracker Cryostat 1 Coldtrapping - 2 Tracker Cryostat 1 Coldtrapping - 3
May 2017 (Henry Nebrensky) - Liquid Hydrogen Absorber turret modifications
LH2 production condenser modifications - 4 LH2 production condenser modifications - 5 LH2 production condenser modifications - 6
April/May 2017 (Henry Nebrensky) - Liquid Hydrogen Absorber installation
LH2 Absorber pressure test LH2 Absorber in FC1 - 3 LH2 Absorber safety window LH2 system - 3 LH2 Absorber in FC1 - 4
LH2 system - 1 LH2 production condenser modifications - 1 LH2 production condenser modifications - 2 LH2 production condenser modifications - 3 LH2 system - 2
April 2017 (Henry Nebrensky) - various around MICE Hall
Loading-Bay Chiller pipework - 2 Loading-Bay Chiller pipework - 1 Loading-Bay Chiller pipework - 3
Target fibres - Jn Box B single-mode Target fibres - Jn Box B multi-mode Cryo-compressor water leak Trench hoist
March 2017 (Henry Nebrensky) - Liquid Hydrogen Absorber installation
Header tank for SS diode absorber tray cooling water Endcaps in MICE Hall LH2 Absorber in FC1 - 1 Hydrogen gas bottle platform LH2 Absorber in FC1 - 2
March 2017 (Henry Nebrensky) - Various around MICE Hall
Header tanks for Loading Bay Chiller circuit - 2 Trench roof panel - 1 Trench roof panel - 2
Stuck diffuser iris - 1 Stuck diffuser iris - after run Stuck diffuser iris - movie
February 2017 (Henry Nebrensky) - LH2 Absorber
Liquid Hydrogen Absorber removal - 1 Liquid Hydrogen Absorber removal - 2 Liquid Hydrogen Absorber removal - 3
CM47 Collaboration Dinner
Collaboration Dinner - 1 Collaboration Dinner - 2 Collaboration Dinner - 3
February 2017 (Henry Nebrensky) - Various around MICE Hall
R78 Target - replacement end flanges Contamination in de-min water Header tanks for Loading Bay Chiller circuit - 1
January 2017 (Henry Nebrensky) - Proton Absorber Service
Proton Absorber: Upper Limit Switches - 1 Proton Absorber: Upper Limit Switches - 2 Proton Absorber: Lower Limit Switches - 1 Proton Absorber: Lower Limit Switches - 2
Proton Absorber Slab Alignment - down Proton Absorber Slab Alignment - up
January 2017 (Henry Nebrensky) - Various around MICE Hall
Temporary Neutron Monitor SSU Link Box Window SSD Link Box Window FC Box Window Trench Heat Exchanger - Counter-flow replumbing
Stressed limit switch on Proton Absorber - 1 Stressed limit switch on Proton Absorber - 2 Limit switch on Proton Absorber Oil on Proton Absorber Air Lines - 1 Oil on Proton Absorber Air Lines - 2
LH2 test in R9 Dumped electrical flex
January 2017 (Henry Nebrensky) - Various around MICE Hall
Proton Absorber Limit Switches - 1 Proton Absorber Limit Switches - 2 APC RBC24 cabling Sunrise from R1 Detached Mixing Valve
.

Newer Photos Older Photos

Henry Nebrensky Valid XHTML 1.0 Transitional 5 September 2017