MICE logo

MICE Photo Album

Cooling Channel graphic
-
Newer Photos Older Photos

MICE Collaboration
Collaboration Meeting CM41 Collaboration Collaboration Collaboration Meeting CM45 - 2 Collaboration Meeting CM45
Painting the MICE wall
Winning design Runner-up Presentation at Neutrino 2016 conference
January 2018 (Henry Nebrensky) - Upstream Beamline and DAQ Crates
DAQ Crates - 2 DAQ Crates - 1 DAQ Crates - 3
ISIS beampipe extraction window - 3 Upstream quads roll angle - 1 Upstream quads roll angle - 2 Survey reference mark underneath D1
3 and 4 January 2018 (Henry Nebrensky) - Target Fibre Inspection
Target fibres - Jn Box B single-mode Target fibres - Jn Box B multi-mode Target fibres - Jn Box C Target fibres - Jn Box C single-mode Target fibres - Jn Box C single-mode
20 December 2017 - MICE Briefing
MICE Briefing
19 December 2017 (Henry Nebrensky) - End of Running
Running Negatives Another water leak in Trench All closed up :( Cactus - 1 Cactus - 2
14 December 2017 (Craig Macwaters) - Installation of Wedge Absorber
Wedge Inspection Cooling Channel Wedge installed in Focus Coil (looking downstream)
12 December 2017 (Henry Nebrensky) - Test fit of Wedge Absorber in R9
Test fit of Wedge Absorber in R9 - 4 Test fit of Wedge Absorber in R9 - 1 Test fit of Wedge Absorber in R9 - 2 Test fit of Wedge Absorber in R9 - 3 Test fit of Wedge Absorber in R9 - 5
Test fit of Wedge Absorber in R9 - Craig Macwaters Production LH2 Absorber after removal - 6 Production LH2 Absorber after removal - 7 Spare LH2 Condenser
December 2017 (Henry Nebrensky) - Quench, Target Fibres, Snow
SSD after quench New Target Index Laser Snowy fields Snow on MICE van
November 2017 (Henry Nebrensky) - various around MICE
Bad DAQ read-out - 1 Either fungi or dead leaves Fluffy clouds Mushrooms Bad DAQ read-out - 2
Water leak in trench LH2 Absorber removal from Focus Coil - 2 LH2 Absorber removal from Focus Coil - 1 Test Cap for Linde Fridge
Production LH2 Absorber after removal - 5 Production LH2 Absorber after removal - 1 Production LH2 Absorber after removal - 2 Production LH2 Absorber after removal - 3 Production LH2 Absorber after removal - 4
CM49 Collaboration Dinner
CM49: Tracker Channel Mapping Champagne Challenge winner! CM49 Collaboration Dinner
September/October 2017 (Henry Nebrensky) - Liquid Hydrogen preparations and various around MICE
H2 gas LH2 Gas Panel closed up Hall searched and ready PRY Access Platform closed More H2 gas
R78 target dust viewport R78 test area - 1 R78 test area - 2 R9 Control Crates
August 2017 (Henry Nebrensky) - various around MICE
Air-con unit 3 snowball - 1 Air-con unit 3 snowball - 2 R78 Target Controller Fibre offcuts on beampipe
4 August 2017 (Henry Nebrensky) - D1 field measurement
Hall probe - 1 Hall probe - 2 Hall probe - 3
July 2017 (Henry Nebrensky) - ISIS Synch and Target inspection
ISIS beampipe extraction window - 1 ISIS beampipe extraction window - 2 Disassembled dipole (SP 7) - 1 Disassembled dipole (SP 7) - 2 Nimrod dipoles
20 July 2017 (Henry Nebrensky) - MICE Hall: LH2 condenser and Beamstop restraint frame
Beamstop restraint frame - bent bolt Beamstop restraint frame - mounting holes (left) Prototype LH2 condenser Beamstop restraint frame - mounting holes (right) Beamstop restraint frame - fresh bolts
July 2017 (Henry Nebrensky) - R78 Target
Test rig re-start - 1 Test rig re-start - 2 Test rig re-start - 3 Test rig re-start - 4
27 June 2017 - CM48 (Institute of Physics, Belgrade)
CM48 - 1 CM48 - 2 CM48 - 3 CM48 - 4 CM48 - 5
More pictures available from IPB gallery
Danube at IPB Zemun Quay
23 June 2017 (Henry Nebrensky) - ISIS Synch and Target Fibre inspection
Disassembled dipole (SP 7) View of Target area Historical artefact... POMPOM sensor 1
Target fibres - Jn Box C single-mode Target fibres - Jn Box C multi-mode Craig's Steak Frites Target fibres - Jn Box B single-mode Target fibres - Jn Box B multi-mode
June 2017 (Henry Nebrensky) - R9
LH2 production condenser modifications - 7 LH2 production condenser modifications - 8 LH2 production condenser modifications - 9
May 2017 (Henry Nebrensky) - Coldtrapping the Tracker Cryostats
Tracker Cryostat 2 Coldtrapping - 1 Tracker Cryostat 2 Coldtrapping - 2 Tracker Cryostat 2 Coldtrapping - 3
EMR Rack Correct Status
Tracker Cryostat 1 Coldtrapping - 1 Tracker Cryostat 1 Coldtrapping - 2 Tracker Cryostat 1 Coldtrapping - 3
May 2017 (Henry Nebrensky) - Liquid Hydrogen Absorber turret modifications
LH2 production condenser modifications - 4 LH2 production condenser modifications - 5 LH2 production condenser modifications - 6
April/May 2017 (Henry Nebrensky) - Liquid Hydrogen Absorber installation
LH2 Absorber pressure test LH2 Absorber in FC1 - 3 LH2 Absorber safety window LH2 system - 3 LH2 Absorber in FC1 - 4
LH2 system - 1 LH2 production condenser modifications - 1 LH2 production condenser modifications - 2 LH2 production condenser modifications - 3 LH2 system - 2
April 2017 (Henry Nebrensky) - various around MICE Hall
Loading-Bay Chiller pipework - 2 Loading-Bay Chiller pipework - 1 Loading-Bay Chiller pipework - 3
Target fibres - Jn Box B single-mode Target fibres - Jn Box B multi-mode Cryo-compressor water leak Trench hoist
March 2017 (Henry Nebrensky) - Liquid Hydrogen Absorber installation
Header tank for SS diode absorber tray cooling water Endcaps in MICE Hall LH2 Absorber in FC1 - 1 Hydrogen gas bottle platform LH2 Absorber in FC1 - 2
March 2017 - FC1 Controller Burnout
FC1 Controller Burnout - 1 FC1 Controller Burnout - 2 FC1 Controller Burnout - 3
March 2017 (Henry Nebrensky) - Various around MICE Hall
Header tanks for Loading Bay Chiller circuit - 2 Trench roof panel - 1 Trench roof panel - 2
Stuck diffuser iris - 1 Stuck diffuser iris - after run Stuck diffuser iris - movie
February 2017 (Henry Nebrensky) - LH2 Absorber
Liquid Hydrogen Absorber removal - 1 Liquid Hydrogen Absorber removal - 2 Liquid Hydrogen Absorber removal - 3
CM47 Collaboration Dinner
Collaboration Dinner - 1 Collaboration Dinner - 2 Collaboration Dinner - 3
February 2017 (Henry Nebrensky) - Various around MICE Hall
R78 Target - replacement end flanges Contamination in de-min water Header tanks for Loading Bay Chiller circuit - 1
January 2017 (Henry Nebrensky) - Proton Absorber Service
Proton Absorber: Upper Limit Switches - 1 Proton Absorber: Upper Limit Switches - 2 Proton Absorber: Lower Limit Switches - 1 Proton Absorber: Lower Limit Switches - 2
Proton Absorber Slab Alignment - down Proton Absorber Slab Alignment - up
January 2017 (Henry Nebrensky) - Various around MICE Hall
Temporary Neutron Monitor SSU Link Box Window SSD Link Box Window FC Box Window Trench Heat Exchanger - Counter-flow replumbing
Stressed limit switch on Proton Absorber - 1 Stressed limit switch on Proton Absorber - 2 Limit switch on Proton Absorber Oil on Proton Absorber Air Lines - 1 Oil on Proton Absorber Air Lines - 2
LH2 test in R9 Dumped electrical flex
January 2017 (Henry Nebrensky) - Various around MICE Hall
Proton Absorber Limit Switches - 1 Proton Absorber Limit Switches - 2 APC RBC24 cabling Sunrise from R1 Detached Mixing Valve
.

Newer Photos Older Photos

Henry Nebrensky Valid XHTML 1.0 Transitional 31 January 2018