MICE Installation Meeting

September 13, 2007 — RAL

G06-R76 — 11:00 start

-


Draft agenda:

  1. Overview (K. Long)
  2. Target (C. Booth)
  3. Beam line status, measurements etc. (K. Tilley)
    1. Beam line and hall installation (C. Nelson)
    2. Beam solenoid status (T. Bradshaw)
  4. ToF0 (M. Bonesini)
  5. CKOV (L. Cremaldi)
  6. ToF0 & CKOV integration (W. Lau)
  7. Spectrometer solenoid (S. Virostek)
  8. Tracker (K. Long)
  9. Diffuser (W. Lau)
  10. "Tracker module" integration (G. Barber)
  11. Network (A. Oates)
  12. DAQ (JS. Graulich)
  13. Controls Infrastructure (B. Martlew)
  14. Electrical Installation (I. Mullacrane)
  15. Mechanical Services (C. Nelson)
  16. Cosmic instrumentation integration test (K. Long)
  17. AoB
13:30 - 14:30: MSPM as usual

Speakers can upload talks here.


The following phone links are available for people who can't attend in person:
Dial-in Number: 1-510 665 5437
Morning session (11:00 RAL time) - 10:00-noon GMT
Participant code: 642626 (MICO AM)
Afternoon session (14:30 RAL time) - 13:30-17:00 GMT
Participant code: 642676 (MICO PM)

Yağmur Torun September 12, 2007