Tuesday Jan 13 Wednesday Jan 14 Thursday Jan 15 Friday Jan 16 Saturday Jan 17
09:00-10:30 [Rm 210]
Plenary-1
(Blondel, Zisman)
Introduction; meeting goals
[Rm 210]
Plenary-3
(Blondel/Nichols)
Schedule/planning update
[Rm 529/531]
Parallel-D
Tracker (Long)
FC Module/Absorber (Lau)
[Rm 210]
Collaboration
Board
[Rm 210]
Plenary-5
(Blondel/Zisman)
Wrap-up
10:30-11:00
Break
11:00-12:30 [Rm 210]
Plenary-2
(Blondel, Zisman)
DS update; MOM report
[Rm 210/206]
Parallel-C
Analysis (Cobb)
Safety (Nichols, Zisman)
[Rm 529/531]
Parallel-E
Tracker (Long)
RFCC Module (Li, Virostek, Wang)
[Rm 210]
Plenary-4
(Long/Zisman)
Selected summaries
[Rm 210]
Executive
Board
12:30-13:30
Lunch [HIT Nan Yuan Cafeteria 3rd flr]
13:30-15:00 [Rm 529/531]
Parallel-A
Target (Booth)
DAQ+Controls (Graulich)
HIT Campus Tour [Rm 529/531]
Parallel-F
Beamline Commissioning (Blondel, Apollonio)
Software (Ellis)
Outing
15:00-15:30
Break
15:30-17:30 [Rm 529/531]
Parallel-B
PID (Palladino)
Engineering Integration (Lau, Nichols)
[Rm 210]
Technical
Board
[Rm 529/531]
Parallel-G
Beamline Commissioning (Blondel, Apollonio)
Software (Ellis)
18:30 Reception
[JinGu Hotel 3rd flr]
Evening Lecture (Blondel)
[HIT Zheng Xin Bldg Rm 109]
Banquet
[HIT Xi Yuan Hotel 2nd flr]
Ice Festival
Tuesday Jan 13 Wednesday Jan 14 Thursday Jan 15 Friday Jan 16 Saturday Jan 17

Speakers can upload talks here.

Detailed Program
TuesdayWednesdayThursdayFridaySaturday
Tuesday Jan 13
— Plenary 1 [Rm 210] — Chair: ShiXian Zheng —
09:00-09:15WelcomeProf. ShuGuo Wang
09:15-09:30Meeting LogisticsLi Wang
09:30-10:00Introduction and Meeting GoalsMike Zisman
10:00-10:30Project Manager's ReportAndy Nichols (Zisman)
10:30-11:00Break
— Plenary 2 [Rm 210] — Chair: Mike Zisman —
11:00-11:30Target UpdateChris Booth
11:30-12:00Decay Solenoid UpdateKen Long
12:00-12:30MOM ReportDan Kaplan
12:30-13:30Lunch
— Parallel A —
Target [Rm 529] — Chair: Chris Booth
13:30-14:00Mechanical Changes & ScheduleJason Tarrant (Nichols)
14:00-14:20Offline Test PlansChris Booth
14:20-14:40Discussionall
14:40-15:00Control Electronics UpgradePaul Smith (Booth)
15:00-15:10DAQ/Monitoring ChangesPaul Hodgson (Booth)
15:10-15:30Discussionall
DAQ-Controls — Chair: Jean-Sebastien Graulich
13:30-13:45DAQ IssuesJean-Sebastien Graulich
13:45-14:00Controls and Networking IssuesMalcolm Ellis
14:00-14:15Target and ISIS Monitoring in EPICSPierrick Hanlet
14:15-14:35Discussionall
14:35Adjourn to target session
15:00-15:30Break
— Parallel B —
PID [Rm 529] — Chair: Vittorio Palladino
15:30-15:45Status of CKOV DetectorsLucien Cremaldi (Kaplan)
15:45-16:15TOF Detectors Status & PlansBonesini designee (tbc)
16:15-16:45KL+Supports Status and PlansLudovico Tortora (tbc)
16:45-17:00EMR UpdateGianrossano Giannini (tbc)
17:00-17:30Discussionall
Engineering Integration [Rm 531] — Chair: Steve Virostek
15:30-16:00Integration Issues (incl. vacuum)Wing Lau
16:00-16:15Infrastructure IssuesAndy Nichols
16:15-16:30Installation IssuesSteve Virostek
16:30-17:00Hydrogen R&D StatusMike Courthold (tbc)
17:00-17:30Discussionall
18:30Reception [JinGu Hotel 3rd flr]
TuesdayWednesdayThursdayFridaySaturday
Wednesday Jan 14
— Plenary 3 [Rm 210] — Chair: Gail Hanson —
09:00-09:10EMR IssuesJean-Sebastien Graulich
09:10-09:20Infrastructure and RF Power IssuesAndy Nichols (Zisman)
09:20-09:35Planning SummaryAlain Blondel
09:35-09:50MANX UpdateRichard Sah
09:50-10:05MICE Review of MANXJohn Cobb (Ellis)
10:05-10:20NFMCC 5-Year R&D PlanAlan Bross
10:20-10:30Discussionall
10:30-11:00Break
— Parallel C —
Analysis [Rm 210] — Chair: Yagmur Torun
11:00-11:10Analysis PhilosophyJohn Cobb
11:10-11:15Spectrometer Field MeasurementTerry Hart (Cobb)
11:15-11:35Beam Characterization with TOFsMark Rayner
11:35-11:50Spectrometer Alignment TolerancesDavid Forrest
11:50-12:00StatisticsDavid Forrest
12:00-12:30Discussionall
Safety [Rm 206] —Chair: Steve Virostek
11:00-11:15Safety ApproachAndy Nichols
11:15-11:30CDM Issues (incl. installation)Andy Nichols
11:30-11:45PPS Design and IssuesKen Long
11:45-12:00RF Safety IssuesDerun Li/Bob Rimmer
12:00-12:30Discussionall
12:30-13:30Lunch
13:30-15:00HIT Campus Tour
15:00-15:30Break
15:30-17:30Technical Board meeting [Rm 206]
18:30Evening Lecture (Alain Blondel) [HIT Zheng Xin Bldg Rm 109]
TuesdayWednesdayThursdayFridaySaturday
Thursday Jan 15
— Parallel D —
FC Module, incl. absorber [Rm 529] — Chair: Shigeru Ishimoto
09:00-09:40Progress Since PRRWing Lau
09:40-09:55Absorber Production StatusShigeru Ishimoto
09:55-10:10Absorber Window ProductionWing Lau
10:10-10:30Cold Mass Support TestsWing Lau
Tracker [Rm 531] — Chair: Alan Bross
09:00-09:10Cosmic Analysis ReportMalcolm Ellis
09:10-09:20Mechanical StatusGeoff Barber
09:20-09:30Cryogenic System StatusAlan Bross
09:30-09:40Electronics & Firmware StatusTerry Hart (Bross)
09:40-09:50DAQ StatusHideyuki Sakamoto
09:50-10:00Reconstruction & Monte CarloMalcolm Ellis
10:00-10:30Documentation Discussionall
10:30-11:00Break
— Parallel E —
RFCC Module [Rm 529] — Chair: Derun Li
11:00-11:25RFCC Module & Cavity UpdateSteve Virostek
11:25-11:35Coupling Coil Status & PlansLi Wang
11:35-12:00Coupling Coil DesignH. Wu/X.L. Guo/H. Pan
12:00-12:20Large Coil TestFengYu Xu
12:20-12:30DiscussionDerun Li
Tracker [Rm 531] — Chair: Ken Long
11:00-11:15Hall Probe IntegrationGeoff Barber/Frank Filthaut
11:15-11:30Tracker Services & InterlocksCraig MacWaters/Terry Hart
11:30-11:45Tracker-Diffuser InterfaceGeoff Barber/Wing Lau
11:45-12:00Tracker-Solenid InterfaceGeoff Barber/Steve Virostek
12:00-12:15Tracker-DAQ Interface & SoftwareJean-Sebastien Graulich/Hideyuki Sakamoto
12:15-12:30Calibration Data Needs Discussionall
12:30-13:30Lunch
— Parallel F —
Software [Rm 529] — Chair: Malcolm Ellis
13:30-14:00IntroductionMalcolm Ellis
14:00-14:30Online ReconstructionDavid Adey
14:30-15:00TOF ReconstructionMark Rayner
Beamline Commissioning [Rm 531] — Chair: Marco Apollonio
13:30-13:35IntroductionMarco Apollonio
13:35-13:55Target Issues for Beam LineKen Long (tbc)
13:55-14:20ORBIT Beam Loss SimulationsAdam Dobbs (Apollonio)
14:20-14:45G4beamline CalculationsMarco Apollonio
14:45-15:00Fermilab Detector UpdateAlan Bross
15:00-15:30Break
— Parallel G —
Software [Rm 529] — Chair: Malcolm Ellis
15:30-16:00Database UpdateDavid Forrest
16:00-16:30GRID UpdateHenry Nebrensky
16:30-17:30Discussionall
Beamline Commissioning [Rm 531] — Chair: Marco Apollonio
15:30-15:50Diffuser Fabrication StatusStephanie Yang
15:50-16:15Simulations: Tools and StatusMarco Apollonio
16:15-17:30Discussion (Normalization, Target Material and Orientation, ..)Alain Blondel
18:30Banquet [HIT Xi Yuan Hotel 2nd flr]
TuesdayWednesdayThursdayFridaySaturday
Friday Jan 16
09:00-10:30Collaboration Board meeting
10:30-11:00Break
— Plenary 4 [Rm 210] — Chair: Ken Long —
11:00-11:15Cooling Channel Summary and PlansMike Zisman
11:15-11:30Detector Summary and PlansAlan Bross
11:30-11:45Infrastructure Summary and PlansKen Long
11:45-12:00Software Summary and PlansMalcolm Ellis
12:00-12:15DAQ + Controls Summary and PlansJean-Sebastien Graulich
12:15-12:30Commissioning Summary and PlansMarco Apollonio
12:30-13:30Lunch
13:30-17:30Outing
18:30Ice Festival
TuesdayWednesdayThursdayFridaySaturday
— Plenary 5 [Rm 210] — Chair: Peter Dornan —
09:00-09:15Technical Board and Safety SummaryMike Zisman
09:15-09:30Collaboration Board SummaryKen Long
09:30-10:30Wrap-upAlain Blondel
10:30-11:00Break
10:30-12:30Executive Board meeting [Rm 210]
TuesdayWednesdayThursdayFridaySaturday

Speakers can upload talks here.


Yağmur Torun January 19, 2009