MICE target        

 

 

Documents:

Drawings:

  • ISIS drawings relevant to the target installed on ISIS.  Note that these drawings are ‘a work in progress’.  Head of directory tree: here.

Photos:

  • Sundry photos collected during target manufacture and commissioning.
    Head of directory tree: here.

History of running target(s) on ISIS:

  • T1 (installed Aug09):
    • Target integrity test archive: here
    • Target inspection photos: here

Radiation surveys:

  • Archive of radiation surveys: here

Meetings:

  • The target group holds regular (weekly) meetings.  The notes on the various meetings together with the information presented my be found here.

Analysis:

  • The analysis of data associated with the operation of the target is documented through the WWW page linked here.

 

Sundry information:

  • History of running 'offline' target(s) in R78:
    • S1.1:
      • History posted here
    • T2R7:
      • Inspection photos: here
      • PH's running history analysis: here
      • Scanned extracts of Log: here
    • T2R6:
      • Inspections photos: here
      • PH's running history analysis: here
      • Scanned extracts of Log: here
    • T2R5:
      • View port photo-history: here
      • PH's running history analysis: here
      • Scanned extracts of Log: here
    • T2R4:
      • View port photo-history: here
      • PH's running history analysis: here
      • Scanned extracts of Log: here
    • T2R2:
      • View port photo-history: here
      • PH's running history analysis: here
      • Scanned extracts of Log: here
  • Draft of target paper:
    • Page with information: here

 

Mail to the MICE Target mailing list: mice-target