Notes:

See slides for the summaries of the various contributions.  I.Mullacrane made a verbal contribution, some notes on this are included below.

The following short notes record agreements and actions only.

We agreed:

  1. Target preparation, installation, and commissioning plan presented by P.Hodgson and linked below was acceptable and should be carried out with a view to installation of the first target assembly (T1) on ISIS in the period 25/26 August 2009;
  2. Installation of the target was taken to include the pump-out of the vacuum space above the pneumatic gate valve and the opening of the gate valve so that the target vacuum space is part of the machine vacuum.  This was the status during operation in 2008.

Actions:

1. Introduction: K.Long

2. Status of component manufacture, assembly, testing, and commissioning plans: P.Hodgson

3. Status of electronics and control system: P.Smith

4. Status of target electrical system: I.Mullacrane

Points noted during discussion of this item:

5. Discussion: All

Phone details:

Phone in numbers are listed in the table which follows.

Please enter:

         The four digit company id: 4673 (callers from outside the UK); and

         The pin number: 419357

 

UK

0845 33 444 60

US

1 641 715 3700 

Austria

0820 4000 1504

Belgium

070 35 9946

Spain

902 885319

France

0826 100 212

Germany

01805 00 66 84

Ireland

0818 270 008

Switzerland

0848 560 192

Holland

0870 001 905

Italy

848 390 170

Sweden

0939 206 6500

Other countries not listed above

+44 845 33 444 60